AAC production line

Description

<br />Sterile line of cellular concrete production<br />Aerocrete and produce the technological process:<br />1. Store raw materials, materials in the store or stores pot after dealing with the reserve, such as lime, cement, gypsum, sand or fly ash<br />2. Aluminum powder or aluminum lotion is through dealing with spare parts for use<br />3. And raw materials according to the measure by matching a certain measure of the balance of the electron, and aluminum powder, water and placed in the aluminum powder mixer is it to make the stop means to mix after measuring<br />4. The assembly is measured in water cold water or hot water pitcher hot water through the electronic water balance<br />5. Placed in and pour the mixers in certain order after, raw materials, aluminum powder suspend the liquid is measured, and enter the casting mold after mixing evenly and should be put to the panel segment of a network of reinforcing bar in advance in the template<br />6. Quiet is a raise in advance to the position through a certain temperature and time, and he was transferred to the cutting machine to hang from the disorder in raising the upset after a 90-degree body density reaches a certain base, and reduce the drawing of patterns<br />A. Base body carries on the side and cut and mills the trough vertically<br />At first<br />B. Then carry on the vertical level to reduce<br />C. Finally, cut horizontally<br />D. Cut the body of a good base, and raise to cauldron car go on one yard of shelves organize into groups to steam to transport to hang to drive a vehicle to load<br />7. Increase the products well, after the production of boiler plate broken off with fingers and thumb cut off by the Board with the fingers and thumb machine to steam<br />8. Stack of the final product crane or forklift to finished product field pile support in accordance with the specifications for the<br />9. Evaporation and lift car and side board and entering the next Council to deliberate and return later, is dump the final product, with the lifting of disturbed mold frame association that drawing patterns get off, and the restoration of 90 degrees

Shipping Type

Free Shipping

  • Shipping Type: EMS
  • Support Country:

Charged Shipping

  • Shipping Type: EMS
  • Estimated Delivery Time: 5-8 Days

Price List

  • Sample: No
  • Quantity Range (Piece): --
  • Price(Per Piece): N/A
  • Processing Time(Days): --

Related Keywords